From Columbia. electricity prices rose more than twice as fast as inflation in 2025 — a break from six years of tracking it — and the culprit isn’t data centers directly, it’s the grid spending they’re triggering.
The counterintuitive finding
This is a lit review from CGEP’s Diego Rivera Rivota, Leander Weigelt, Gaspar Simon Guevara, Douglas J. Arent, and David Sandalow, not new empirical work — which makes its central claim more interesting, not less. Across 2019–2024, states with faster load growth generally saw smaller price increases or real declines, because fixed grid costs get spread over more sales. That inverted in 2025, and the paper’s read is that this isn’t really about load growth at all — it’s aging infrastructure, wildfire and storm hardening, and record utility rate-base requests ($18.2 billion in 2025, versus $8.2 billion in 2019) doing the work. Natural gas price pass-through and RPS solar carve-outs get their own shares of blame too.
Where data centers actually bite
The paper’s most useful contribution for readers tracking this beat is the disaggregation of “surplus value” versus cost-shifting. E3’s analysis — commissioned by Amazon — finds hyperscale data centers in CA, OR, VA, and MS running a fiscal surplus for ratepayers, paying more than their marginal cost of service and functioning as a subsidy. PG&E claims 1 GW of new load cuts household bills 1–2%. But Peskoe and Martin’s Harvard EELP work argues the opposite mechanism dominates: utilities classify data-center-driven transmission builds as generic “reliability upgrades,” socializing the cost, then use confidential special contracts to obscure whether large loads are actually covering their marginal cost. UCS puts a number on it — $4.3 billion charged to ratepayers in 7 of 13 PJM states in 2024 alone for data-center-driven transmission. Both dynamics are apparently live simultaneously, which is the actual news: this isn’t settled, it’s regionally and structurally contingent.
Familiar ground
The PJM section is a clean roundup of ground already covered here — the FERC show-cause colocation order, the CIFP board letter on the Expedited Interconnection Track, the BRA clearing-price jump. Useful as a citation anchor, not new reporting. The federal section (the Ratepayer Protection Pledge, Van Hollen’s Power for the People Act, the Hawley-Blumenthal GRID Act) is a solid bill tracker for future reference.
edited and authored by Dave with close collaboration by Claude