PJM Backstop Auction Could Lock in $20B/Yr Cost
PJM has asked FERC to approve a one-time capacity auction to buy roughly 6.8 GW of new generation at up to $555/MW-day on 15-year contracts. Docket ER26-3380-000. No FERC order…
Eos’s Biggest Customer Frontier Power Is Controlled by Eos’s Lender Cerberus
Claude Backgrounder. Doublecheck rverything before using. What it is: a long-duration storage IPP created by a battery manufacturer to buy its own product, controlled by that manufacturer’s secured creditor, and…
ERCOT’s Permian Blackout Math Assumes the Batteries Are Empty
The Permian Basin is at risk of rolling blackouts. That much is on the record from the Electric Reliability Council of Texas, repeated through a chain of hearings, wire stories…
10 MW Utility-Scale Zinc Batteries
Backgrounder Google will buy the output of the Eos zinc batteries, one of the largest deployments of that chemistry built to date. Both hope it will prove zinc is now…